Camden Valley Way C2C Design Alliance

Macarthur Region, NSW

 

The Project

Construction of a 10km dual divided carriageway including significant public utility adjustments, construction of three large box culverts, large retaining walls, a bridge over the Sydney Water supply pipelines, and significant property adjustments.


Our Services

MIEngineers prepared tender documents, quantity take-offs, schedules, detailed estimates and contract documentation. This included an in-depth analysis of the mass haul, utilities adjustments, erosion and sedimentation, property access as well as cross-overs and tie-ins to the existing roadway. MIEngineers also prepared a Construction Staging Report, undertook Constructability Reviews and Workshop Facilitation, and produced staging and traffic flow drawings for three construction packages.

The delivery of our services involved intensive consultation and collaboration with RMS and their designers to understand the technical and commercial requirements of the works.

MIEngineers' broad experience and expertise enabled consistency across multiple disciplines including estimating, contract documentation and constructability.