Jane St and Mulgoa Rd Infrastructure Upgrade
Penrith, NSW
The Project
The project generally involves:
- Signalised intersection upgrade
- Widening of Mulgoa Road to allow for six through lanes
- Replacement and realignment of the existing rail underbridge on Castlereagh Road to allow for 3 lanes of traffic in each direction
- A separated pedestrian and cycle path including staged pedestrian crossing
- Introduction of a bus priority lane
- Local realignment and protection of existing utility services
Our Services
MIEngineers provided concept cost estimates and reporting for the 20%, 80% and Final design stages. We also undertook an economic evaluation and related reporting at 80% and Final concept stages, in accordance with TfNSW requirements, for inclusion in Business Case submission.