our projects
Sydney Harbour Bridge - Review of AMU System

Transport for NSW proposed replacing the four existing Sydney Harbour Bridge arch maintenance units (AMUs) with two new movable gantries, enhancing access and safety for inspections and maintenance.
The work is needed to allow better access and safety for inspections and maintenance on the Sydney Harbour Bridge arch.
The main features are as follows:
• Removal of the four existing AMUs
• Installation of a track system along the top of bridge arches
• Installation of two new AMUs
• Relocation of the existing walkways on the bridge arch, from the centre to the outer edge